1. FBE/2FBE Pipe External Coating Production Line

                new time£º2015/3/7 10:06:02


                 

                FBE/2FBE Pipe External Coating Production Line

                 

                Note£º1¡¢Pipe incoming rack  2¡¢Spiral conveyor for blasting line  3¡¢Gas preheating furnace  4¡¢Pipe external blasting machine  5¡¢Blasted pipe outgoing rack  6¡¢Pipe internal blowing device  7¡¢Inspection platform  8¡¢Linear conveyor for waste pipe return  9¡¢Waste pipe return rack  10¡¢Spiral conveyor for coating line  11¡¢IF heating device  12¡¢FBE spraying device  13¡¢Cooling tower device  15¡¢Pipe coating cooling room  16¡¢Coated pipe outgoing rack  17¡¢End-of-pipe treatment device  18¡¢Finished pipe outgoing rack

                 

                 

                Technical Parameter

                S.N.

                Name

                Technical parameters

                1

                Pipe diameter

                ¦µ101¡«¦µ1219mm

                2

                Pipe length

                8¡«12.5m

                3

                Voltage¡¢frequency

                380v/220v¡¢50HZ

                4

                Total power

                About 4300KW

                5

                Air pressure

                0.4¡«0.6Mpa

                6

                The compressor pressure/throughput

                0.8Mpa/10X2m3

                7

                Water consumption

                2% of the total water amount

                8

                Productivity

                300-400m2/hr

                 

                contact

                Langfang Dingsheng Mechanical Equipment Co., Ltd

                Tel£º86-0316-2207771

                86-0316-2207773

                Tel£º18831688900

                Fax£º86-0316-2231218

                E-mail:dshjx@vip.sina.com

                Add£ºNO. 198, AI'MIN ST. EAST, LANGFANG£¬HEBEI, CHINA

                 

                无码不卡精品动漫在线视频_婷婷在线无码电影_亚洲高清无码黄色一级片_911久久精品无码